28/3/09 - Installation of steel truss

28/3/09 - Excavation for toe drain in progress

27/3/09 - Concreting NJB in progress


26/3/09 - Connecting new fiber optic cable

21/3/09 - Concreting Works for Box Culvert up to Finished Level (Night Work).

20/3/09 - Concreting Works for 3 Nos. of Toll Islands (Night Work).

20/3/09 - Steel trusses welding work in progress

19/3/09 - M&E piping ready for toll booth island.

19/3/09 - Box culvert reinforcement bar erection in progress.

17/3/09 - Transition slab concreting in progress.

12/3/09 - BRC fixing for concrete pavement.

12/3/09 - Water proofing membrane installation in progress.

10/3/09 - Concreting for the 1st concrete pavement in progress (night work).

10/3/09 - Fibre optic cable installation in progress (not urinate!).

6/3/09 - Concreting work for 300 mm x 300 mm box culvert at Toll Booth area.

5/3/09 - Concreting Box Culvert Extension Wall

4/3/09 - M&E Works for Generator Services.